HPC AI Data Centers Powered by Design

Circe builds HPC data center campuses around reliable, behind‑the‑meter natural gas generation, so you’re not waiting on the grid.

Now building in West Texas.

Reserve capacity
Our Build Standard

Power‑First, Built for AI

We design, build, and operate AI-ready data centers engineered from the power system up.

Our behind-the-meter natural gas microgrids are engineered for mission-critical reliability. The system architecture integrates multiple generation resources to provide greater redundancy across the data center complex, eliminating single points of failure. Integrated waste heat recovery supports direct liquid cooling and drives industry-leading energy efficiency.

Power‑First Architecture

Guarantee energy security without grid delays through modular deployments in 10 to 24 MW blocks, enabling energization early whilst maintaining resiliency and predictable energy pricing.

Density by Design

Direct-to-chip liquid cooling, immersion-ready suites, and waste heat reuse enable 70–132 kW racks with exceptional efficiency.

Build Certainty

We accelerate deployment by pre-ordering long-lead equipment, securing permits early, and managing a disciplined FEED-to-EPC-to-commissioning process with firm delivery milestones—ensuring every project hits its timeline.

Operate and Scale

24/7 NOC with BMS and SCADA, dual A and B power paths, dual MMRs with diverse carriers, and a modular platform that scales cleanly to new sites.

Lock Capacity Now

West Texas HPC Campus

Circe Energy’s flagship Permian campus is built for the future of AI.

Launching with 50MW in 2026, 150MW in 2027, and scaling to 1.1GW by 2030, we deliver unmatched resiliency, efficiency, and growth potential.

Resiliency Built In

Behind-the-meter natural gas power ensures uptime, stability, and cost certainty.

Modular & Scalable Anywhere

Our 10MW and 24MW block design can be rapidly deployed in other locations, giving tenants access to Circe Energy’s solutions wherever capacity is needed.

Tenant Flexibility

Powered shell, HPC colocation, Built-to-Suit, or GPU-as-a-Service — with tailored agreements that scale as you grow.

Prime Connectivity

Strategically located on I-20 fiber corridors linking Dallas, El Paso, and beyond.

AI-Ready Density

Designed for 70–132kW racks with direct liquid cooling and ultra-low PUE (<1.10).

Sustainable by Design

Lower carbon footprint, waste-heat recovery, and renewable integration with onsite solar / BESS.

By integrating land, energy, and connectivity, Circe Energy makes scalable, future-proof AI campuses possible anywhere.